Summary
Power & Control (PAC) was contracted for the turnkey supply and installation of all electrical systems for a new substation. Despite an aggressive timeline, PAC delivered the project safely, on schedule, and to the highest industry standard, ensuring the substation was fully operational by the client's deadline.
Challenge
The client required a complete electrical fit-out for a new substation, a critical piece of infrastructure. The project scope was extensive, and the delivery timeframe was exceptionally tight, demanding precise project management and zero margin for error. The primary challenge was to coordinate the installation of multiple complex systems simultaneously without compromising safety or quality.
PAC's Solution
PAC delivered a comprehensive, end-to-end solution, managing all aspects of the electrical installation. Our services included:
Outcome
Through meticulous planning and the dedicated teamwork of our on-site engineers, PAC successfully completed the full installation within the stipulated timeframe. The project was delivered: