Food Technology Room Electrical Refurbishment

CLIENT
Chipping Norton School
SECTOR
Commercial
TECHNOLOGY
Electrical


Power & Control (PAC) was contracted for the turnkey electrical refurbishment of a food technology room. PAC managed the full project lifecycle, from the initial strip-out of legacy systems to the installation and commissioning of a complete, modern electrical infrastructure, including full fire alarm and security integration.

WhatsApp Image 2025-10-29 at 14.28.32.jpeg

Challenge
The client's existing food technology room was outdated. Its electrical systems were no longer efficient, compliant, or fit for the demands of a modern learning environment with high-load appliances. The client required a complete overhaul to enhance safety, improve energy efficiency, and ensure seamless integration with existing building management systems.

PAC's Solution
PAC delivered a comprehensive, end-to-end refurbishment solution. Our services included:

  • Decommissioning: Safe and complete strip-out of all redundant electrical wiring, containment, and distribution boards.

  • New Distribution: Installation of a new, fully compliant mains distribution board, specified to safely manage the room's high electrical load.

  • Power & Lighting: A complete rewire, including all small power circuits for workstations and appliances, and the installation of energy-efficient LED lighting.

  • Containment: Installation of modern, robust containment systems to house all new cabling neatly and safely.

  • System Integration: Crucially, our team integrated the new installation with the building's existing fire alarm and security systems, ensuring a unified and compliant safety infrastructure.

Outcome
Through meticulous project management and high-quality workmanship, PAC transformed the space on schedule. The key outcomes include:

  • A Modern, Safe Environment: The room is now fully compliant with current electrical and safety standards, providing a safe space for students and staff.

  • Improved Efficiency: The new LED lighting and modern wiring significantly reduce the room's energy consumption and operational costs.

  • Full Functionality: The facility is now equipped to handle the demands of all modern appliances and IT equipment.

  • High-Standard Finish: The project was completed to the high standard of quality and attention to detail that PAC is known for.

NICEIC
Chas
HEIS
MCS
Renewable Energy Hub
RCP
OLEV
Trust a Trader
Solar Nation
Contstructionline

Our website uses cookies.

By clicking "Yes, I'm happy" you allow cookies that improve your experience on our website, help us analyse our performance and enable us to show you relevant marketing content.